Feasibility Study IAB Establishment Surveys
Project duration: 30.06.2023 to 30.12.2025
Abstract
The overall objective of the feasibility study is to develop a concept that examines the extent to which parts of the existing establishment surveys can be merged. It will also be examined how high-frequency elements can be integrated into the surveys.
Management
30.06.2023 - 30.12.2025
30.06.2023 - 30.12.2025
30.06.2023 - 30.12.2025
30.06.2023 - 30.12.2025
Employee
30.06.2023 - 30.12.2025
30.06.2023 - 30.12.2025
30.09.2023 - 30.12.2025